Dear passengers please be informed that on the area of Benedikt on 1. 4. 2022 a complete road closure Lenart-Gornja Radgona will be implemented, that will last till 30. 4. 2022 or till the construction works will finish.

Changed operation of public bus transport due to complete road closure Lenart-Gornja Radgona

Dear passengers please be informed that on the area of Benedikt on 1. 4. 2022 a complete road closure Lenart-Gornja Radgona will be implemented, that will last till 30. 4. 2022 or till the construction works will finish.

For all transports from direction Gornja Radgona-Benedikt public bus transport will be redirected on a detour Spodnja Ščavnica-Bačkova-Benedikt. During the time of the road closure bus stops Ihova and Trstenik will not be operated.

In direction Benedikt-Gornja Radgona public bus transport will be operated on two different routes over Negova. During the time of the road closured bus stop Trstenik will not be operated. Bus stop Benedikt (in both directions) and Ihova (in direction Gornja Radgona) will be moved to temporary locations.

To ensure quality transportation service for passengers most of the departure times will change, some drives will be operated directly without stops on the highway.

Additionally, the departure at 15.15 from Trate in direction Gornja Radgona will not be operated.

> Changed timetables

Changed timetables are available also in the online timetables.

Thank you for your understanding.

We wish you a safe and pleasant ride.

Arriva Slovenia