{"id":23237,"date":"2026-11-12T10:28:51","date_gmt":"2026-11-12T09:28:51","guid":{"rendered":"https:\/\/arriva.si\/zacasna-prestavitev-avtobusnega-postajalisca-bezena-robic-in-mozne-zamude-zaradi-gradbenih-del\/"},"modified":"2026-11-12T10:58:23","modified_gmt":"2026-11-12T09:58:23","slug":"temporary-relocation-of-the-bezena-robic-bus-stop-due-to-construction-work","status":"publish","type":"post","link":"https:\/\/arriva.si\/en\/temporary-relocation-of-the-bezena-robic-bus-stop-due-to-construction-work\/","title":{"rendered":"Temporary relocation of the Bezena Robi\u010d bus stop due to construction work"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Dear passengers,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Please be advised that construction work will begin on Monday, November 16, 2026, for the construction of a sidewalk and the partial replacement of the water supply system along regional road R2-435\/1431. The work will take place over a 350-meter stretch, extending from the Hofer store to the bus stop near Jugova ulica (AP Bezena Robi\u010d).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the construction period, traffic past the work site will be regulated by alternating one-way flow. Delays are to be expected during peak hours; please allow for longer travel times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Robi\u010d bus stop will be temporarily relocated to the start of the construction zone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work is scheduled to be completed by December 28, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We apologize for any inconvenience this may cause.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Thank you for your understanding.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We wish you a safe and pleasant journey.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Arriva<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dear passengers, Please be advised that construction work will begin on Monday, November 16, 2026, for the construction of a sidewalk and the partial replacement of the water supply system along regional road R2-435\/1431. The work will take place over a 350-meter stretch, extending from the Hofer store to the bus stop near Jugova ulica [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":21053,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[124,160,167],"tags":[],"class_list":["post-23237","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-unit-ptuj","category-maribor","category-slovenska-bistrica"],"acf":[],"_links":{"self":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts\/23237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/comments?post=23237"}],"version-history":[{"count":3,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts\/23237\/revisions"}],"predecessor-version":[{"id":23241,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts\/23237\/revisions\/23241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/media\/21053"}],"wp:attachment":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/media?parent=23237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/categories?post=23237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/tags?post=23237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}