{"id":22125,"date":"2026-08-11T00:57:00","date_gmt":"2026-08-10T22:57:00","guid":{"rendered":"https:\/\/arriva.si\/obvestilo-o-zapori-ac-prikljucka-brnik\/"},"modified":"2026-08-12T05:43:57","modified_gmt":"2026-08-12T03:43:57","slug":"notice-of-closed-ac-connector-brnik","status":"publish","type":"post","link":"https:\/\/arriva.si\/en\/notice-of-closed-ac-connector-brnik\/","title":{"rendered":"NOTICE OF CLOSED AC CONNECTOR BRNIK"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The company Gorenjska gradbena dru\u017eba d.d. is constructing a roundabout in the area of \u200b\u200bthe intersection of the main road G2-104\/1136 Kranj \u2013 Sp. Brnik and the motorway junction AC-A2\/0108 Priklju\u010dek Brnik.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the laying of the asphalt wear layer, it will be necessary to establish a temporary traffic regime in the area of \u200b\u200bthe roundabout, which is planned to be implemented in two phases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In both phases, a partial closure will be established in the area of \u200b\u200bthe state road on the section G2-104\/1136 Kranj \u2013 Sp. Brnik, from km 3.975 to km 4.410, with alternating one-way traffic with manual or traffic light control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manual traffic control will be established at all times during working hours. Traffic light control will be established outside working hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Simultaneously with the partial closure in the area of \u200b\u200bthe state road, a complete closure of the AC-A2\/0108 motorway junction Brnik, branch A, branch B, branch C and branch D will be established.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Traffic from both directions will be redirected to the AC-A2\/0107 motorway junction Kranj Vzhod.<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Buses driving via Brnik during the closure will take the specified detour<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The complete closure will be established during the period (weekend):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Saturday 15. 8. 2026 \u2013 Sunday 16. 8. 2026<\/strong><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"601\" height=\"440\" data-title=\"image\" data-caption=\"\" data-description=\"\" src=\"https:\/\/arriva.si\/wp-content\/uploads\/2026\/08\/image-4.png\" alt=\"\" class=\"wp-image-22107\" title=\"\" srcset=\"https:\/\/arriva.si\/wp-content\/uploads\/2026\/08\/image-4.png 601w, https:\/\/arriva.si\/wp-content\/uploads\/2026\/08\/image-4-300x220.png 300w\" sizes=\"auto, (max-width: 601px) 100vw, 601px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Thank you for your understanding<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We wish you a safe and pleasant drive<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Arriva<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The company Gorenjska gradbena dru\u017eba d.d. is constructing a roundabout in the area of \u200b\u200bthe intersection of the main road G2-104\/1136 Kranj \u2013 Sp. Brnik and the motorway junction AC-A2\/0108 Priklju\u010dek Brnik. During the laying of the asphalt wear layer, it will be necessary to establish a temporary traffic regime in the area of \u200b\u200bthe [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":20607,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[165,169],"tags":[],"class_list":["post-22125","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kranj","category-ljubljana"],"acf":[],"_links":{"self":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts\/22125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/comments?post=22125"}],"version-history":[{"count":2,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts\/22125\/revisions"}],"predecessor-version":[{"id":22128,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/posts\/22125\/revisions\/22128"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/media\/20607"}],"wp:attachment":[{"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/media?parent=22125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/categories?post=22125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arriva.si\/en\/wp-json\/wp\/v2\/tags?post=22125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}